Two-Stage Commercial HVAC Upgrade | Surfers Paradise
We delivered a high-precision, two-stage mechanical upgrade for a premier Gold Coast hotel, executed strictly to engineered plans under demanding turnaround deadlines. Operating within an active hotel environment, the project required meticulous scheduling and rapid execution to hit key milestones without disrupting ongoing guest operations.
A key highlight of the fit-out was the precision craftsmanship of the exposed rigid ductwork, meticulously constructed and finished to serve as a feature that seamlessly complements the interior architectural design. To ensure peak energy efficiency and optimal control, our team collaborated closely with Alerton to upgrade the Building Management System (BMS). Additionally, given the coastal location, all outdoor equipment was treated with specialised protective coatings to resist salt air corrosion and extend plant service life.
Stage One
The main focus of stage one was the mechanical overhaul centred on high-volume key spaces, including the hotel’s main ballroom and grand foyer.
AHU Plant Replacements: Fast-tracked decommissioning and replacement of 2 main central Air Handling Unit (AHU) with high-efficiency plant equipment, dramatically boosting overall capacity.
Stage Two
Stage 2 included the refurbishment of 9 high use, shared areas on level 2 including areas such as the gym and laundry.
Level 2 Fit-Out: Complete mechanical overhaul across Level 2, featuring precision-fabricated rigid ductwork designed to maximize static pressure efficiency and deliver balanced, high-volume airflow across the floor.